TRADE WASTE GUIDE | AUSTRALIA

Trade Waste Agreements Explained: What Councils Actually Assess Before Approval

A trade waste agreement is the written permission a council or water utility gives a business to discharge non-domestic wastewater into the sewer. Before approving it, assessors look at what’s in the water, how much of it there is, and whether your pre-treatment can reliably keep it within their limits.

If a trade waste application or renewal has come back asking for pre-treatment details you don’t have, you’re not the first. It’s usually fixable once you know what the assessor is actually looking for.

Get A Quote | in 24 HoursCall 1800 524 002

Trade Waste by the Numbers

Figures from Australian water authorities and regulators

200

Penalty units in Victoria for discharging trade waste without an agreement or consent, plus 80 for each day it continues

1,000 L/h

Minimum oil water separator capacity for vehicle washing set by SA Water and Central Coast Council

20 m²

Largest unroofed wash-down area Water Corporation accepts in Western Australia

40 days

After which state concurrence is assumed in regional NSW if the department hasn’t refused or asked for more information

Sources: Yarra Valley Water; SA Water Vehicle Washing guideline; Central Coast Council; Water Corporation; NSW Liquid Trade Waste Management Guidelines 2021.

Key Takeaways

  • Any business wastewater other than domestic sewage needs approval before it goes to sewer.
  • Whoever sends the property’s sewerage bill is usually who approves trade waste.
  • Assessors rate your discharge by risk, and that rating drives conditions and fees.
  • Wash bays need listed, correctly sized pre-treatment, a plan to keep rain out, and backflow protection.
  • Acceptance limits differ between authorities, so a pass in one city isn’t a pass everywhere.
  • Approvals don’t automatically follow a sale or a new tenant.

What a Trade Waste Agreement Is and Who Needs One

Trade waste is any liquid waste from a business other than domestic sewage from toilets and staff amenities. Depending on where you are, the approval might be called an agreement, a permit, a consent or a licence. The idea is the same.

You’ll need one if your property discharges wastewater from activities like these:

Wash Bays

Vehicle, truck and machinery wash-down

Workshops

Automotive repairs, servicing and parts washing

Food Businesses

Cafes, restaurants, bakeries and food preparation

Industry

Manufacturing and other industrial processes

Discharging Without Approval Is an Offence

In Victoria, section 178 of the Water Act 1989 makes it an offence to discharge trade waste to a water corporation’s sewerage system without an agreement or consent. The penalty is 200 penalty units, plus 80 penalty units for each day the offence continues. In regional New South Wales, discharging liquid trade waste without council approval is an offence under the Local Government Act 1993.

Council or Water Utility: Who Approves Trade Waste in Your Area

State or territory Who approves trade waste
New South Wales Sydney Water and Hunter Water in their areas. Elsewhere, the local council under section 68 of the Local Government Act 1993, often with state concurrence
Victoria The local water corporation, such as Yarra Valley Water, South East Water or a regional water corporation
Queensland Urban Utilities (Brisbane, Ipswich, Lockyer Valley, Scenic Rim and Somerset), Unitywater (Moreton Bay, Sunshine Coast and Noosa), otherwise the local council
Western Australia Water Corporation across most of the state
South Australia SA Water
Tasmania TasWater
ACT Icon Water
Northern Territory Power and Water Corporation

Quick tip: if you’re unsure, check who sends the property’s sewerage bill. That’s usually who approves trade waste.

What Goes Into a Trade Waste Application

Most applications ask for the same core information, whether you apply online or on a paper form.

About the Business and Site

  • Business and property details
  • The property owner’s consent if you’re a tenant
  • A description of the activities producing wastewater
  • A site plan and plumbing plans from a licensed plumber

About the Wastewater

  • Expected daily and peak flow volumes
  • A list of chemicals and detergents, often with safety data sheets
  • Details of your pre-treatment equipment
  • How that equipment will be maintained

Missing owner consent and vague pre-treatment details are two of the most common reasons an application sits in a queue.

How Assessors Rate the Risk of a Wash Bay Discharge

Assessors classify your discharge by risk, and that classification drives everything from approval conditions to fees. In regional New South Wales, the state’s Liquid Trade Waste Management Guidelines (2021) sort discharges like this:

Classification Risk Typical volume State concurrence
A Low Generally up to 5 kL a day Assumed automatically
B Medium Up to 20 kL a day Required, unless the council holds assumed concurrence for Class B
C High risk or large Above Class A and B limits Required for every application
S Tankered human waste Septic, dump point and pump-out waste Required, unless the council holds assumed concurrence for Class S

Where concurrence is needed, it is assumed if 40 days pass after the council seeks it without the department refusing or asking for more information.

What Assessors Weigh

  • Public health
  • Worker safety
  • Sewer capacity
  • Treatment plant impact
  • Pre-treatment adequacy
  • Chemical storage
  • Stormwater ingress

A wash bay with oil, sediment and an unroofed area ticks several of those boxes, which is why it gets more scrutiny than a cafe.

Pre-Treatment Requirements for Vehicle and Machinery Wash Bays

Industrial oil water separator with treatment tanks and pipework used to pre-treat vehicle wash wastewater.

Requirements vary, but the pattern is consistent. SA Water’s vehicle washing guideline is a good example of a full pre-treatment train where oil and grease exceed 100 mg/L:

1. Silt Trap

A bucket with a 2 mm nominal mesh catches coarse solids.

2. Settling Sump

A settling and pump sump of at least 400 L lets solids drop out.

3. Non-Emulsifying Pump

Moves water to the separator without shearing oil into tiny droplets.

4. Oil Water Separator

Minimum 1,000 L/h capacity before discharge to sewer.

A pump that shears oil into tiny droplets defeats the separator, which is why authorities insist on non-emulsifying pumps. Here’s how a few authorities compare:

Authority Separator requirement Not accepted as final pre-treatment Worth knowing
SA Water Minimum 1,000 L/h Not stated in the guideline 2 mm silt trap and 400 L sump required where oil and grease exceed 100 mg/L
Central Coast Council (NSW) Coalescing plate unit of at least 1,000 L/h, or a larger unit sized to flow Double and triple interceptor pits Only non-emulsifying pumps may feed the separator
Water Corporation (WA) Vertical gravity, coalescing plate or hydrocyclone separator Single, double and triple interceptors Only quick-breakdown detergents may be used
Sydney Water Sized to your maximum hourly flow Unlisted equipment Publishes a list of approved pre-treatment products

Use listed equipment, and you’ll usually avoid a lot of back and forth.

Bunding, Roofing and Keeping Rainwater Out of the Sewer

Sewers aren’t built for stormwater, so authorities set firm rules on keeping rain out of the wash bay.

Authority Roofing rule Keeping surface water out
Water Corporation (WA) Wash-down areas larger than 20 m² must be roofed. Unroofed areas are charged per square metre of catchment unless the discharge is metered Bund the area or design it to exclude rain, with surrounding areas sloping away
SA Water All areas draining to sewer must be roofed, with an overhang of at least 1 m for every 3 m of roof height on exposed sides Reverse grade, perimeter hump, bund wall or similar
Central Coast Council (NSW) Wash area must be roofed Roofed, bunded and graded, with stormwater diverted away

Backflow Prevention on the Wash Bay Water Supply

Wash bays can contaminate the drinking water supply if water flows backwards through a hose. Water Corporation classes wash bays as a high hazard backflow risk and requires a boundary containment device. Central Coast Council requires a reduced pressure zone device on the incoming supply, registered with council. Testable devices generally need periodic testing by a licensed plumber.

Acceptance Criteria and Discharge Limits

Wastewater samples and testing instruments used to assess industrial discharge quality and pH levels.

Every authority publishes its own acceptance criteria, and they’re not the same:

Parameter Sydney Water (2026-27) SA Water vehicle washing guideline
Petroleum hydrocarbons 10 mg/L (flammable) Not specified separately
Oil and grease Grease 110 or 200 mg/L, depending on treatment plant Up to 100 mg/L
Suspended solids 600 mg/L Up to 500 mg/L
pH 7 to 10 6 to 10

Oil and Grease Limits Compared (mg/L)

SA Water 100
Sydney Water, primary treatment plants 110
Sydney Water, secondary or tertiary plants 200

Suspended Solids Limits Compared (mg/L)

SA Water 500
Sydney Water 600

The Takeaway

A result that passes in Sydney doesn’t automatically pass in Adelaide.

WashBay HQ oil water separators are designed for discharge under 10 mg/L TPH with no visible oil sheen, which gives you headroom under most limits.

How Trade Waste Fees and Charges Are Calculated

Fees vary by authority, but usually include some mix of the following:

Fee type When it applies
Application fee When you lodge a new application
Annual fee Each year the approval is in place
Inspection or re-inspection fees When the authority visits, or returns after a failed inspection
Usage charges Based on the volume you discharge
Quality charges Per kilogram of pollutant, usually for larger or industrial dischargers

Example: Sydney Water Quality Charges, 2026-27

Pollutant Primary treatment plants Secondary or tertiary plants
Suspended solids $0.646 per kg $2.101 per kg
Grease $0.615 per kg $1.796 per kg

Non-Compliance Costs More

In New South Wales, regional councils can apply non-compliance usage charges when pre-treatment isn’t installed or maintained. Check your authority’s current prices before budgeting.

Inspections, Sampling and Servicing Records After Approval

Approval isn’t the finish line. Authorities can inspect your site, take samples and ask for records. Water Corporation, for example, requires a written maintenance contract for coalescing plate separators, vertical gravity separators and hydrocyclones, following the manufacturer’s servicing requirements.

Keep These Together in One File

  • Service reports for your separator and pre-treatment equipment
  • Pump-out receipts from your licensed liquid waste contractor
  • Any sampling results
  • Your current approval and its conditions

If an inspector visits, that file is your best defence.

Renewals, Changes of Ownership and Approval Terms

Approvals don’t follow the business automatically. Any change to the activity or wastewater usually means a fresh application.

Situation What usually happens
New owner or tenant, Urban Utilities area (QLD) Approvals can’t be transferred, so the new owner or tenant must reapply
Regional NSW, owner holds the approval A new occupier doesn’t need a new approval, but the owner must notify council. A new owner needs a new approval
Regional NSW, occupier holds the approval A new occupier needs a new approval. A new owner doesn’t, but must consent for the discharge to continue
Change to activity or wastewater Usually a fresh application
Approval term ends Terms vary. Dubbo Regional Council approvals, for example, lapse five years after issue

Diarise your renewal date.

Common Reasons Applications Stall and How to Avoid Them

Problem How to avoid it
No owner consent If you’re leasing, get it signed early. Chasing a landlord can add weeks on its own
Unlisted or undersized pre-treatment Use listed equipment, sized to the peak hourly flow from every pressure washer and hose that can run at once
No plan for rainwater Show on the site plan exactly where rainwater goes
Missing backflow details Include the device type and where it’s installed
Chemical list doesn’t match the site Check every product on site against your list and safety data sheets

Call Before You Lodge

Most trade waste officers are happy to tell you what they’ll want to see.

Answer Every Point at Once

If your authority asks for more information, answer every point in one response. Partial replies usually just mean another round of questions.

Getting Your Wash Bay Ready for the Assessor

Above-ground modular vehicle wash bay with steel ramps, drainage system and wastewater pre-treatment tanks.

1. Discovery Call

We go through your site, your wastewater, and what your council or water utility has asked for.

2. Proposal

Within 24 hours, you’ll get a quote for the bay and pre-treatment your authority expects.

3. Design & Approval

We hand over drawings, specifications and Form 15 certificates to attach to your application.

Who Prepares the Paperwork?

It’s the question that holds up more applications than any other. With WashBay HQ, the answer is mostly us.

  • Engineering documentation and drawings
  • Form 15 compliance certificates
  • Help putting the trade waste application together
  • Above-ground modular wash bays and oil water separators made in Australia
  • Bunding, sediment traps and stormwater diversion options

Trade Waste Agreement FAQs

It’s the written permission a council or water utility gives a business to discharge non-domestic wastewater into the sewer. Depending on where you are, it may be called an agreement, a permit, a consent or a licence. It sets the conditions your discharge must meet.
Yes, if it drains to sewer. Wash bays produce wastewater containing oil, grease, detergent and sediment, which counts as trade waste. Water Corporation, for example, states that approval is required for any wash-down area connected to sewer.
It depends on your location. Major utilities such as Sydney Water, Urban Utilities, Unitywater, SA Water, Water Corporation, TasWater, Icon Water and Power and Water handle it in their areas, and Victorian water corporations handle it there. In regional NSW and parts of Queensland, it’s the local council. Check who sends your property’s sewerage bill.
Usually a solids stage, such as a silt trap and settling sump, followed by an oil water separator fed by a non-emulsifying pump. SA Water and Central Coast Council both set a minimum separator capacity of 1,000 L/h for vehicle washing, and several authorities don’t accept interceptor pits as final pre-treatment. Always check your authority’s listed equipment.
Often, yes. SA Water requires all areas draining to sewer to be roofed, and Water Corporation requires wash-down areas larger than 20 m² to be roofed, charging unroofed areas per square metre unless the discharge is metered. Bunding or grading to keep surface water out is also commonly required.
Each authority sets its own. Sydney Water’s 2026-27 standards include 10 mg/L for flammable petroleum hydrocarbons, 600 mg/L for suspended solids and pH 7 to 10. SA Water’s vehicle washing guideline sets up to 100 mg/L oil and grease, up to 500 mg/L suspended solids and pH 6 to 10. WashBay HQ oil water separators are designed for discharge under 10 mg/L TPH with no visible oil sheen.
It varies by authority and risk. In regional NSW, where state concurrence is needed, it is assumed if 40 days pass without the department refusing or asking for more information. Complete applications with listed pre-treatment, owner consent and clear site plans move fastest.
Not always. Urban Utilities approvals can’t be transferred, so a new owner or tenant must reapply. Under the NSW guidelines, it depends on whether the owner or the occupier holds the approval. Any change to the activity or wastewater usually needs a fresh application.
It’s an offence. In Victoria, the penalty under section 178 of the Water Act 1989 is 200 penalty units, plus 80 penalty units for each day the offence continues. In regional NSW, discharging without council approval is an offence under the Local Government Act 1993.
Yes. WashBay HQ supplies engineering documentation, drawings and Form 15 compliance certificates, and helps you put the trade waste application together. Our above-ground modular wash bays and oil water separators are made in Australia, with bunding, sediment traps and stormwater diversion options available.

Talk Through Your Application or Renewal

To talk through an application or renewal, call 1800 524 002 or email sales@washbayhq.com.au.

Get A Quote | in 24 HoursCall 1800 524 002

And if your council or utility asked for something you didn’t expect, mention it in the comments. It’ll help the next person in the same spot.

Related Posts